Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T09CM03304
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/29/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
04/25/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
04/13/2011 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* 1) LOADING DOCK RESTROOM AREA OK, PHARMACY OK, DEMO PREP OK, MENS & WOMENS PUBLIC RESTROOMS OK AND FOOD SERVICE OK 2) SUPPORT INDIRECT DRAINS AT SODA FOUNTAIN 3) COMPLETE WATER PIPING TO EXISTING SYSTEM TO ENSURE BACKFLOW IF REQUIRED IN TIRE CENTER AND INSTALL HOSE BIB OVERHEAD 4) TIRE CENTER OK 5) PROVIDE BACKFLOW PROTECTION FOR WATER TO DEVELOPER ? RECOVERY AND COMPLETE INSULATION BEHIND ACCESS PANEL FOR PHOTO AREA 6) OPITCAL AREA OK, BAKERY OK, MEAT PREP OK, ROTISSERIE OK AND DELI OK 7) NEED TO SEE EXTERIOR TRAFFIC RATED CLEANOUTS |
|
04/11/2011 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* | |
04/08/2011 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* | |
04/07/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) BAKERY AREA ONLY-NO VACUUM BREAKER ON VALVE DOWN STREAM OF VACUUM BREAKER FOR WATER TO CHEMICAL ADDITION AT 4 COMP SINK 2) ALL CLEANOUTS PLUGS TO BE FACTORY TAPPED WITH MACHINE SCREWS 3) SUPPORT OVER HEAD PIPING AND SECURE 4) PROVIDE BACKFLOW PROTECTION FOR HOSE REEL AT WASHING SYSTEM 5) PROVIDE BACKFLOW PROTECTION FOR E-7 BAKERY OVENS PER P-3.1 6) PROVIDE DRAINS 7) PROVIDE LABELING RPPB |
|
03/15/2011 | PLUMBING - FINAL | Not ready for Inspection | 1. ONE SINGLE RESTROOM AT LOADING DOCK INSTALLED. CHLORINE INJECTION IN PROGRESS. |