Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/10/2010 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* | |
| 03/08/2010 | MECHANICAL - FINAL | Partial Approval | IVRS - Inspection :* 1) FOAM REFRIDGERANT PIPE INSULATION IS TO BE COATED FOR PROTECTION FROM U.V. WHEN INSTALLED ON EXTERIOR OF BLDG PER MANUFACTURES INSTALLATION INSTRUCTIONS 2) LOW VOLTAGE CONTROL WIRING TO BE PROTECTED B4 CONDUIT OR SOME OTHER MEANS FROM DAMPER 3) PER SECTION 403.2.1 I.E.C.C. SUPPLY AND RETURN DUCTS SHALL BE INSULATED TO A MIN. R-8 |