Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/18/2010 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 10/13/2010 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 09/28/2010 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) NO MESSAGE TO MAKE CONTACT FOR INSPECTION 2) NO ACCESS AT 10:18 3) I CALLED 622-4782 CONTACTED TIM (TS) TO INFORM OF CORRECTIONS REQUIRED AGAIN |
|
| 09/16/2010 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) CONTRACTOR TO PAY REINSPECTION FEE FOR CONTINUED FAILURE TO MAKE CORRECTIONS LISTED ON THIS INSPECTION SHEET |
|
| 08/04/2010 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SOLAR WATER HEATER HAS BEEN RELOCATED FROM PAST INSPECTION 2) CONDUIT TO BE SUPPORTED OFF OF ROOF SURFACE, NO SCREWS DIRECTLY INOT ROOF SURFACE 3) PROVIDE ROOF JACK FOR ELECTRICAL THRU ROOF 4) PROVIDE WEATHER PROOF GASKET FOR JUNCTION BOXES ON ROOF 5) PROVIDE APPROVED CONNECTORS AT ALL CONDUIT AND BOX CONNECTION |
|
| 04/29/2010 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* APPROVED PLAN + PERMIT NOT ON SITE MAKE ALL CORRECTIONS ON THIS INSPECTION SHEET LISTED FROM 12/21/09. THE GROUND WIRE IS NOT ATTACHED TO THE HEATER. CONTRACTOR TO PAY REINSPECTION FEE PRIOR TO FINAL INSPECTION. HAVE PETITION OF APPEAL FILLED OUT BY OWNER THAT WAS LOFT ON SITE. |
|
| 04/26/2010 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) NO ACCESS AT 11:10 |
|
| 12/21/2009 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) TUBING AND PANEL TO BE SUPPORTED MINIMUM 1 1/2" ABOVE ROOF SURFACE, SUPPORTED AND SECURED AT CORRECT INTERVALS FOR TUBING USED |