Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/17/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 08/04/2010 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE 2 POLE 30 AMP BREAKER FOR 220 VOLT CIRCUIT 2) PROVIDE GFI 110 OUTLET FOR PUMP 3) SEE NOTES FROM 4/30/20 AND COMPLY |
|
| 07/20/2010 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) CONTRACTOR TO PAY REINSPECTION FEE FOR FAILURE TO COMPLY WITH CORRECTIONS FROM 4/30/10 INSPECTION ON THIS SHEET 2) PLEASE HAVE AN ELECTRICIAN COMPLY WITH REQUIREMENTS AND READ ALL NOTES & COMPLY |
|
| 04/30/2010 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE AN APPROVED MEANS FOR DISCONNECT FOR NEW ELECTRIC CIRCUIT FOR WATER HEATER 2) PROVIDE APPROVED CIRCUIT WIRING FOR WATER HEATER AND PUMP CIRCUITS 3) PROVIDE ACCESS TO ELECTRICAL PANEL PANEL TO VERIFY BREAKER LABELED AND CORRECT 4) INSULATION TO BE SEALED WITH ADHESIVE AND PROTECTED FROM SUN EXPOSURE 5) PANEL SUPPLY TUBING TO BE PROTECTED FROM WOOD AT ROOF LEVEL OF WATER HEATER SHED |
|
| 04/27/2010 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NO ACCESS TO PLAN AND PERMIT 2) NO ACCESS TO ROOF AT 10:45 AM |