Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T09CM03146
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/05/2011 | ENGINEERING - FINAL | Approved | ||
12/27/2010 | ENGINEERING - FINAL | Partial Approval | Bond required for basin - as-builts needs to be submitted, reviewed, approved and used for final inspection. | |
12/01/2010 | ENGINEERING - FINAL | Approved | Approved, see grading permit for site comments | |
11/29/2010 | ENGINEERING - FINAL | Continued | Contractor remove 2 curb ramps and formed to proper grade, I checked grade and they are OK, will pour today. Bond for basin should be delivered today. |
|
11/23/2010 | ENGINEERING - FINAL | Denied | Provide bond for basin, if bond is approved OK for Temp C of O. Remove all construction activity from parking lot. Replace 2 HC ramps |
|
11/22/2010 | ENGINEERING - FINAL | Denied | Provide as-built drawings Provide bond for detention basin replace 2 curb ramps provide bollards in drive access or revise plan |