Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/08/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 01/06/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) BY WHAT METHOD DID YOU STERILIZE THE WATER SYSTEM ? 2) REMOVE RAISED SQUARE HEAD CLEANOUT, AND INSTALL COUNTER SINK TAPPED CLEANOUT PLUG WITH MACHINE SCREW 3) FLUSH HANDLE TO BE ON WIDE SIDE OF WATER CLOSET 4) SINKS REQUIRE CLEANOUTS 5) PLAN CALLS FOR LOOSE KEY ANGLE STOPS 6) PLAN CALLS FOR TEMPERING VALVES AT LAVS 7) PROVIDE DETAIL FOR SINK WITH EQUIPMENT AT NO VALVES DOWNSTREAM |