Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/25/2009 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 11/23/2009 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE COMBUSTION AIR TO WATER HEATER 2) PROVIDE 10 PSI TEST ON ENTIRE GAS SYSTEM WITH TEST GUAGE IN 1/10 POUND INCREMENTS WITH NO LOSS OF PRESSURE FOR 15 MINUTES 3) ALL UNDERGROUND PIPING TO BE FACTORY COATED (SCOTCH COAT PIPE) WITH FITTINGS AND TOOL MARKS PRIMED WITH PIPE TAPE PRIMER THEN WRAPPED WITH PIPE TAPE TO EQUAL 40 MIL THICKNESS OF WRAP 4) PROVIDE APPROVED (AGA OR CSA) GAS VALVES TO SHUT OFF ALL APPLIANCES 5) CAP OLD GAS PIPING TO STOVE AREA AT WATER HEATER 6) NEW WATER REQUIRES AN APPROVED TEMPERATURE AND PRESSURE RELIEF DRAIN FULL SIZE PIPING GRAVITY DRAIN TO DAYLIGHT TERMINATING AT 90 DEGREE DOWN 7) PROVIDE BONDING OF BLDG GAS PIPING 8) YOUR YARD PIPING IS UNDER SIZED FOR 162,000 BTU DEMAND ON SYSTEM PROVIDE 1" 9) VENT FROM WATER HEATER REQUIRES FASTENERS AT JOINTS DBL WALL LINER IS PULLED UP AND OUT PARTIALLY ON ROOF AND NEEDS REPAIR WITH APPROVED VENT CAP |