Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/11/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 02/09/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*INSTALL ALL VACUUM BREAKERS AT HOSE BIBS, LOCK IN PLACE AS REQUIRED, SECURE BLOCKING ON ROOF, ADDRESS COOLER DETAIL ON PLAN | |
| 02/03/2011 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* relocate vtr to 10' from cooler, protect from uv cooler supply detail hose threads require vac breakers abv ceiling insp |
|
| 01/31/2011 | PLUMBING - FINAL | Not ready for Inspection | 1) PROVIDE ROOF ACCESS 2) TRIM OUT CLEANOUTS 3) SEAL OF FIXTURES AT WALL CONNECTIONS 4) VACUUM BREAKERS ON ALL HBS 5) COMMERCIAL FAUCET WITH APPROVED BACKFLOW PROTECTION REQUIRED AT LAUNDRY TUB |