Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/14/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 1) SHOW METHOD OF STERILIZATION TO BLDG INSPECTOR |
|
| 09/09/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) CONTRACTOR REQUESTING TEMP C OF O STILL NEEDS: 1) METHOD OF STERILIZATION 2) CLEAN BACTERIA REPORT 3) CUT DOWN EXTERIOR CLEANOUTS 4) FLOOR SINK GRATES 5) SUPPORT RECIRC. PUMP 6) INSULATE HOT AND RETURN PIPING 7) LAVS REQUIRE MIXING VALVES |