| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/14/2010 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 09/02/2010 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) GAS PRESSURE TEST OK |
|
| 08/25/2010 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) 2" TIE IN, WATER PIPING OVER HEAD TO HBS, SUPPORTS ON VENT OK |
|
| 08/18/2010 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) PVC TO BE SUPPORTED AT EACH CHANGE OF DIRECTION OR ELEVATION AND AT THE END OF BRANCHES THEN NO MORE THAN 4' BETWEEN HANGERS 2) SUPPORT HORIZONTAL PIPING IN THE WALLS AND ISOLATE PVC FROM METAL STUDS |
|
| 08/16/2010 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* ONLY 1/3 OF TOTAL DEVELOPED LENGTH OF A VENT MAY BE RAN IN THE HORIZONTAL POSITION OK TO COVER WALLS |