Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/18/2009 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
| 12/04/2009 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE AN ELECTRICAL PERMIT FOR THE NEW WIRING. ORIGINAL WATER HEATER WAS GAS 2) ALL SUPPORTS REQUIRED TO BE TREATED, REDWOOD OR OTHER WEATHER RESISTANT SUPPORTS 3) FLASHING REQUIRED AT SVOE PENETRATION 4) PROVIDE SAFE ACCESS TO ROOF 5) IS THERE PROPER ISOLATION BETWEEN METAL AND COPPER AT ROOF PENETRATION ? 6) ISOLATE AND SECURE T & P DRAIN LINE TOUCHING METAL |