Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/15/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 03/03/2010 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) ALL FIXTURES TO BE FUNCTIONAL 2) NEW WATER HEATER REQUIRES CORRECT INSTALL 3) ALL FIXTURES TO BE WATER TIGHT 4) PROVIDE STERILIZATION AND BACTERIA REPORT FOR POTABLE WATER SYSTEM 5) YOU NEED TO HAVE A 03050 GAS PRESSURE TEST ADDED TO THIS PERMIT IF S.W. GAS WILL NO TURN ON YOUR METER. TO OBTAIN A GAS LCEARANCE CARD YOUR GAS SYSTEM WILL NEED TO BE SEEN FOR INSPECTION 6) LIST NOT COMPLETE |