Permit: T09CM02808

Parcel: 117032650


Addresses:

711 N 7TH AV #01


Inspection Status: Approved

Inspection History: PLUMBING - INTERMEDIATE

Permit Number - T09CM02808

Inspection Description - PLUMBING - INTERMEDIATE

Inspection Status - Approved

Date Description Inspector Results Comments
07/19/2010 PLUMBING - INTERMEDIATE Approved IVRS - Inspection :*
07/16/2010 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
1) CLOSET FLANGES ARE TO SIT ON TOP OF FINISHED FLOOR AND EXTEND 1/4" ABOVE FINISHED FLOOR
2) SOLDER 90 DEGREE ELL ON T & P RELIEF DRAIN TERMINUS
3) SET AND HOOK UP DISHWASHERS PRIOR TO FINAL
4) HAVE STERILIZATION AND CLEAN BACTERIA REPORTS
05/21/2010 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) CORRECTIONS MADE OK
2) STILL NEED TO SEE CLOSET FLANGES
05/20/2010 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) WATER TEST DOWN
2) TUB LEAKING
3) BACK PITCHED SECITONS NOT PERMITTED
05/18/2010 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
1. NO TEST ON ABS
2. ABS SHALL BE SUPPORTED AT EACH CHANGE OF DIRECTION OR ELEVATION, AND AT TEH ENDS OF BRANCHES; THEN, NO MORE THAN FOUR FEET BETWEEN HANGERS. VERTICALLY, PIPING SHALL BE SUPPORTED AT EACH FLOOR WITH MID STORY GUIDES.
3. VENTS SHALL BE INSTALLED LEVEL, OR SO DESIGNED TO DRAIN BACK TO THE FIXTURE SERVED.
4. DRAINAGE PIPING TO BE INSTALLED AT 2% PITCH
5. SHOWER PAN AND TUBS TO BE TESTED.
6. WILL RECHECK CLOSET FLANGES AFTER SUB FLOOR IS INSTALLED.