Inspection History Details
Inspection Status: Cancelled
Inspection History: FIRE SPKLR - FINAL
Permit Number - T09CM02796
Inspection Description - FIRE SPKLR - FINAL
Inspection Status - Cancelled
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/22/2010 | FIRE SPKLR - FINAL | Cancelled | Visited site. Unaware sprinkler system required. | |
10/21/2010 | FIRE SPKLR - FINAL | Denied | According to plans you need a fire sprinkler system installed (7533 sq feet total home) or a fire hydrant within 500 feet with 2250 GPM output for 2 hours. | |
10/21/2010 | FIRE SPKLR - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) NEED TO RESOLVE FOR FINAL BLDG INSPECTIONS |