Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/23/2010 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 09/14/2010 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) POINT OF VENT SHALL BE TAKEN OFF ABOVE THE FLOW LINE, DOWN STREAM OF TRAP 2) POINT OF VENT SHALL BE ABOVE WEIR OF TRAP 3) PROVIDE DRAINAGE FITTINGS ON ? INDIRECT WASTE PIPING 4) PROVIDE CLEANOUTS 5) INDIRECT WASTE PIPING OVER 5' REQUIRES A P TRAP 6) SEAL ALL THREADS 7) ICE BIN DRAINS MAY NOT COMBINE, ALSO NEED TRAPS AND CLEANOUTS MINIMUM SIZE REQUIRED IS 3/4 8) SUPPORT GAS PIPING AT CONNECTIONS, NOT TO EXCEED 8' 9) SECURE RISER AT SOV 10) REPLACE USED FLEX 11) PROVIDE A 10 PSI TEST |