Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/08/2009 | FRAMING | Approved | IVRS - Inspection :* | |
| 10/27/2009 | FRAMING | Not ready for Inspection | IVRS - Inspection :* | |
| 10/23/2009 | FRAMING | Not ready for Inspection | IVRS - Inspection :* | |
| 10/22/2009 | FRAMING | Not ready for Inspection | IVRS - Inspection :* 1) NO ONE ON SITE DOORS LOCKED 2) NOTE: LATH AND FOAM TO BE KEPT UP 2" FROM CONCRETE SLAB 3) WEEP SCREED REQUIRED AT BOTTOM OF WALL FOR MOISTURE AND STUCCO STOP |