Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/23/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 10/16/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) A TIMER CANNOT BE USED AS A DISCONNECTING MEANS, THE DISCONNECT IS REQUIRED TO HAVE CLEAR ACCESS SPACE 2) SEE NOTE #5 IT IS THE PANEL RELIEF DEVICE 3) FAILURE TO MAKE CORRECTIONS CAN RESULT IN REINSPECTION FEES 4) NOTE: CHECK YOU COMPRESSION FITTINGS, THERE ARE LEAKS |
|
| 10/09/2009 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) IN ALL FUTURE INSTALLATIONS THAT YOU INSTALL NEW ELECTRICAL HAVE AN ELECTRICAL INSPECTION ON YOUR ACTIVITY CARD AND SHOW IT AS NEW ON YOUR APPROVED PLAN 2) INSTALL AN APPROVED TYPE VALVE FOR TUBING ONN 3/4" COLD INLET TO WATER HEATER, PUNCTURE TYPE VALVES (SADDLE VALVES) ARE NOT ALLOWED 3) BONDING OR GROUNDING WIRES SHOULD BE TO COLD SIDE PIPING 4) PROVIDE CORRECT COLOR WIRE FOR NEW CIRCUIT WITH A MEANS FOR DISCONNECT FOR THIS NEW ELECTRICAL WATER HEATER 5) PRESSURE RELIEF DEVICE TO TERMINATE 6" TO 24" FROM FINISH GRADE IN DOWNWARD DIRECTION IN VISIBLE AREA 6) PLUMBERS TAPE IS NOT AN APPROVED METHOD TO HANG, SECURE AND SUPPORT EXPANSION TANKS 7) PROVIDE LADDER ACCESS TO 120V CIRCUIT FOR CORRECT MAKE UP & GROUNDING FOR PUMP AND CONTROLLER |