Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
Permit Number - T09CM02626
Inspection Description - FIRE - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/02/2011 | FIRE - FINAL | Approved | ||
07/27/2011 | FIRE - FINAL | Denied | 1. Remove old shower/closet in basement northwest bedroom or add sprinkler coverage. 2. When sprinkler inspection was looked at back on 08/10/2010 riser was not in a room now a new wall was added making a riser room. The room has no sprinkler coverage need to add coverage in this room or remove wall and door. 3. In the basement is the door in the mechanical room 1 hour rated - need to show proof that door is one hour rated and will need to have self closer and latching. 4. Mechanical room (group U) in basement will needs to be a 1 hour separation from (group R-2) IBC table 508.3.3. |
|
08/10/2010 | FIRE - FINAL | Partial Approval | Temporary C of O approved construction work done and approved as per approved plans, to get a final C of O will need to finish the following: 1. Install lock out on breaker for sprinkler bell. DONE 2. Wiring in kitchen shall be in conduit and 4 square box mounted on wall. DONE 3. In basement mechanical room close all holes in walls and add a door or close up wall, all must be done with a rating of 1 hour or more this is to keep fire from getting under the whole house. 4. Basement northeast bedroom remove closet or add a sprinkler head, close up wall where A/C unit is mounted in wall exposing the crawl space under the whole house. DONE |
|
08/06/2010 | FIRE - FINAL | Denied | No Access |