Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T09CM02626

Parcel: 117030170

Inspection Status: Approved

Inspection History: PLUMBING - INTERMEDIATE

Permit Number - T09CM02626

Inspection Description - PLUMBING - INTERMEDIATE

Inspection Status - Approved

Date Description Inspector Results Comments
07/09/2010 PLUMBING - INTERMEDIATE Approved
05/21/2010 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) 2 SHOWER PANS OK
05/10/2010 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) ABS THRU ROOF OK
2) COPPER AND INSULATION OK
04/23/2010 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) DWV THRU ROOF OK
2) WATER OK-RESECURE INSULATION TO PIPING
3) PROVIDE SHOWER DETAIL-SHOW LINER, SECURING METHOD, AND ALL REQUIREMENTS
04/16/2010 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) DWV THRU ROOF WATER TEST OK
2) WATER DISTRIBUTION TO EAST EDGE OF ROOF TEST OK
3) NEED 8" IN AND OUT OF WATER HEATER INSULATED PRIOR TO COVERING, PIPING EXPOSED TO FREEZING REQUIRES INSULATION WITH INSPECTION
4) NEED TO SEE SHOWER PAN LINER WITH TEST PRIOR TO ANY FLOORING
NOTE: WATER HEATER REQUIRES CLEARANCES FROM OPENABLE WINDOWS AND OVERHANGS ON ROOF
03/26/2010 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) DEMO 2ND LEVEL OK
2) WATER TEST 2ND FLOOR RESTROOM WITH SINGLE 3" STACK USED FOR (2) HORIZONTAL STOOL CARRIERS OK PENDING RED LINE ON SITE