Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
Permit Number - T09CM02400
Inspection Description - BUILDING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/24/2009 | BUILDING - FINAL | Approved | ||
09/22/2009 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) AT FINAL HAVE CHECK FOR $75.00 MADE PAYABLE TO CITY OF TUCSON 2) PROTECTION (1 HOUR) REQUIRED AT OVERHANG CLOSER THAN 36" FROM PROPERTY LINE 1-LAYERS 5/8" TYPE 'X' SHEETROCK OR SOLID 2 X FRAME BETWEEN RAFTERS OR CONTINUES 2 X OVER RAFTER TAIL 2) PROVIDE POSITIVE CONNECTION AT ALL POST TO BEAM AS NEEDED 3) REMOVE OR PROTECT ALL ELECTRICAL WIRING IN STORAGE SHED LOWER THAN 8' FROM FINISHED FLOOR |