Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/14/2011 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 10/13/2011 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) YOU HAVE A FLAT SPOT ON YOUR MAIN LINE AND 1/8" OR LESS IN MOST PLACES, BUT YOU ARE 6" ABOVE YOUR HCS STUB. PROVIDE 1/4" WHEN POSSIBLE 2) ALSO YOU HAVE A COUPLE OF BRANCH LINES THAT NEED ADJUSTMENT |
|
| 10/12/2011 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) LETTER REQUIRED FROM KC MECHANICAL ALLOWING CELLULAR CORE PVC FOR BLDG DWV |