Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/03/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 10/21/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 09/30/2009 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* NOTE: IN FUTURE PLEASE CALL IN ALL INSPECTIONS ON CARD PETITION OF APPROVAL ON SITE. NOTO #1 ABOCO & COMPLG SEE NOTE #2 AND COMPLY 1) PRESSURE RELIEF ON PANEL SHALL GRAVITY DRAIN TO 6" TO 24" FROM FINISH GRADE AT GROUND LEVEL 2) INSTALL YOUR SYSTEM PER YOUR APPROVED PIPING PLAN OR HAVE REVISED CITY APPROVED PLAN ON SITE OF THIS INSTALLATION 3) PROVIDE SEDIMENT TRAP ON NEW GAS WATER, GAS ENTRY 4) TEMPERATURE AND PRESSURE RELIEF DRAIN PIPING SHALL GRAVITY DRAIN TO DAY LIGHT OR BE INSTALLED PER CITY OF TUCSON PETITION OF APPEAL FOR ALTERNATE FORM OF T & P RELIEF LEFT ON SITE 5) REMOVE ALL TAPE FROM WATER HEATER VENT PIPING AND PROVIDE 3 FASTENERS AT EACH VENT JOINT |