Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T09CM02318
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/13/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
05/10/2010 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE FRANK PATTERN CLEANOUT COVER IN CONCRETE 2) SEAL THREADS ON CLEANOUT PLUGS 3) OPEN FRONT TOILET SEAT REQUIRED 4) TRAP PRIMER VALVE REQUIRES A UNION AND NEEDS TO BE TURNED ON 5) EXPANSION TANK AND MIXING VALVE REQUIRED 6) PVB REQUIRES A UNION, ALSO PROVIDE CERT 7) CONCRETE AT SHOWER DRAIN NEEDS TO DIRECT ALL SHOWER WATER TOWARDS SHOWER DRAIN 8) PROVIDE CLEANOUT PLUGS LISTED AND RECEIVE SCREW 9) ALL CLEANOUTS SHALL BE ACCESSIBLE 10) PROVIDE ROOF ACCESS 11) LABEL OR LOCK NON POTABLE HOSE BIBS |