Permit: T09CM02299

Parcel: 12701005D

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Permit Number - T09CM02299

Inspection Description - ENGINEERING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
03/16/2010 ENGINEERING - FINAL Approved All items complete, approved
10/30/2009 ENGINEERING - FINAL Partial Approval OK for temp C of O. finish following items prior to final.
1) Install H.C. parking signs
2) Install bumper blocks 5 total
3) remove dumpster from parking lot
4) Install temp fence as discussed.
10/29/2009 ENGINEERING - FINAL Not ready for Inspection Not ready will meet tomorrow
10/28/2009 ENGINEERING - FINAL Denied NO CONTACT LEFT MESSAGE W/ SUPERINTENDENT

SITE NOT COMPLETED CALL FOR INSPECTION WHEN CONSTRUCTION IS FINALED
10/16/2009 ENGINEERING - FINAL Not ready for Inspection Not ready, separate construction activity from entrance, temp fence, remove all construction debris.