03/30/2010 | FRAMING | Approved | ||
10/13/2009 | FRAMING | Partial Approval | IVRS - Inspection :* 1) NOTE: OK FOR 1ST FLOOR |
|
09/29/2009 | FRAMING | Not ready for Inspection | IVRS - Inspection :* 1) FROM LAST INSPECTION CAN'T FIND, CONNECTION 6" X 6" POST TO 1ST FLOOR 2) OPEN UP/STUCCO LATH SO THAT CONNECTION CAN BE SEEN. HOW IS RAIN H20 KEPT OUT OF COL. BASE AT WALKING DECK ? 2) WHEN IS ROOF STRUCTURE TO BE INSTALLED ? 3) RAFTERS ON PLAN WIRE CALL OUT 2 X 6-TOO SMALL HANGERS ALSO. CONTRACTOR CHANGE TO 2 X 8, ALSO WENT WITH BIGGER BEAMS |
|
09/17/2009 | FRAMING | Partial Approval | IVRS - Inspection :* LVS HANGER TAKES MINIMUM OF #8D TECO OR COMMON NAIL, SKEWED NAIL AT 45 DEGREES IS A TOE NAIL, USE #8D COMMON OR BETTER FOR THOSE NAILS. THIS IS A 6 OC, REMOVE SHINNERS |