Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/12/2010 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 02/10/2010 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* | |
| 02/04/2010 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) COMPLETE ALL GAS PIPING AND PROVIDE APPROVED PLAN FOR RED LINE DRAWINGS-ALL CHANGES |
|
| 02/01/2010 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE RED LINE FOR THE WAY GAS WAS INSTALLED 2) PROVIDE REVISION FROM ENGINEER |