Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T09CM01984
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/22/2009 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* 1) ITEMS ON LIST OK |
|
12/18/2009 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NEED OVERCURRENT PROTECTION FOR AIR HANDLER PER NAME PLATE 2) NO MARKING ON UNIT SWITCH AND IT APPEARS TO BE MOLDED CASE SWITCH NOT A CIRCUIT BREAKER |
|
12/16/2009 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) CONDENSING UNIT OVERFUSED 2) PROPERLY TERMINATE EQUIPMENT GROUND FOR WATER HEATER 3) NEED DISCONNECTING MEANS FOR WATER HEATER NEC 422.31 4) NEED PANEL DIRECTORY 5) MARK AIR HANDLER DATA PLATE IF HEAT IS INSTALLED AND IF SO IS UNIT PROPERLY PROTECTED 6) COULD NOT LOCATE ELECTRIC PLANS |
|
11/25/2009 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) SERVICE AND UNIT IS OK FOR POWER 2) CALL BACK FOR FINAL |