Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - ABOVE CEILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/09/2009 | MECHANICAL - ABOVE CEILING | Approved | IVRS - Inspection :* | |
| 09/24/2009 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* 1) AWAITING APPROVAL ON INSULATION CHANGES (LINED ROUND PIPE) INSTALL TILES (CEILINGS) AT OWN RISK |
|
| 09/22/2009 | MECHANICAL - ABOVE CEILING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE INDEPENDENT SEISMIC SUPPORT 2) EXHAUST DUCT SUPPORTED BY EMT 3) LINE ALL DUCT PER SPEC 4) INSTALL DUCT SMOKE DETECTORS PER PLAN 5) PROVIDE OBD PER SPECS AND SCHEDULE 6) VERIFY FLEX CONNECTIONS AT DUCT DROPS FROM UNITS 7) NO BENDS IN FLEX DUCT SEE DETAIL 2 M-1 8) FLEX NOT TO EXCEED 5' PER SPECS 9) PROVIDE ENGINEERS APPROVAL ON ALL CHANGES TO PLANS AND OR SPECS |