Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/13/2009 | MECHANICAL - INTERMEDIATE | Approved | CORRECTIONS HAVE BEEN MADE OK FOR FINAL |
|
| 07/23/2009 | MECHANICAL - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) YOU CANNOT USE BLACK WIRE FOR THE EQUIPMENT GROUND 2) PULL A NEW GREEN WIRE UP TO THE DISCONNECT 3) MARK THE UNIT DATA PLATE WITH PROPER HEAT STRIP 4) NEED TO VERIFY THAT 2" DUCT LINER WAS USED ON ROOF TOP DUCTING 5) TERMINATE CONDENSATE WITHIN 6" OF THE GROUND WITH AN ELBOW AND NIPPLE 6) RE-PAINT ALL PVC COMPLETELY WITH LATEX PAINT 7) TIGHTEN LOW VOLTAGE CONNECTION TO UNIT |