Permit: T09CM01665

Parcel: 13005303G


Addresses:

1915 E 36TH ST

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Date Description Inspector Results Comments
10/05/2009 ENGINEERING - FINAL Approved HYDROSEED PLANTED PER JLINVILLE AND ANDY CONNER C OF O LANDSCAPE INSPECTION. LETTER FROM ENGINEER REGARDING RE-PLANTING AREAS WITH TOLERANT PLANT MATERIALS RECEIVED.
09/03/2009 ENGINEERING - FINAL Partial Approval SITE STABILIZATION CONTINUES WITH HYDROSEED TO BE INSTALLED EARLY NEXT WEEK. CERTIFIED LETTER FROM ENGINEER STILL NEEDS TO BE PRODUCED.
09/02/2009 ENGINEERING - FINAL Denied DENIED: CONTRACTOR NEEDS TO ADDRESS ITEMS ON PUNCH LIST.

INSPECTION REQUEST

Address: 1915 E. 36th St. Project Name: Ace Charter School Permit #: T09BU00956

Contact: Russ Nyman Jack Russell Const. Services Tel. # 419-5429

Email: rnyman@concordinc.com

Inspector: M. Carreon Request Date: 09/02/09 Inspection Date: 09/02/09

Status: Denied Results: Not Ready for inspection


Preliminary Punch List

Contractor needs to complete all site work per approved plan and in compliance with development standards.

1) All areas disturbed by construction need to be stabilized. In particular the areas adjacent to the sidewalk on the e/s of the property @ Kramer, the area to the west side of the main building and the larger area indicated on the plan labeled "native desert area, to remain, no work"
2) Roof drains on both the east and west side of the existing building need to be connected to the sidewalk scuppers.
3) Curb cuts to assist drainage should be installed per plan.
4) Pedestrian gates being installed on the east and west side of the building, across sidewalk areas, need to provide a min. of 3' of clearance.
5) Sidewalk drop off on the west side of the building can be no more that 36"
6) Site needs to be clear of all construction equipment and debris. Removal of rubbish piles on the northside of property and construction fencing on southside of property should be removed.
7) Provide certification letter from Engineer.