Date Description Inspector Results Comments
11/30/2009 PLUMBING - ROUGH, SOIL Approved IVRS - Inspection :*
08/27/2009 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) WATER TEST FROM 3' CONNECTION AT 4" BLDG DRAIN UPSTREAM 3" WYE THRU TO 3 X 2 FOR GREASE TRAP WITH 3" FCO AND 2" FOR FLOOR SINK INSTALLED TO INTERMEDIATE TEST HEIGHT WITH DRAINAGE FITTINGS. 3" BRANCH GOES NORTH EAST 3" WYE WITH END OF KLINE CLEANOUT TO 3" RISER WITH 2" MOP SINK, 3 X 2 WYE FOR FLOOR AINK TO INTERMEDIATE HEIGHT PER REDLINES ON INITALED KP1.0 AND ISOMETRIC ON RWS 8/19/09 KP2.0
08/26/2009 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
1) CONTRACTOR CANCELLED
08/23/2009 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
1) POST YOUR SUITE NUMBER
2) PROVIDE ONE REVISED APPROVED PLAN SHOWING THE WORK TO BE DONE. IF YOU CANNOT FOLLOW THE PLAN, RED LINES MUST BE AVAILABLE AT THE TIME OF INSPECTION-NO EXCEPTIONS