Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T09CM01601
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/10/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
10/08/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE STERILIZATION PER PLAN WITH WRITTEN PROCEDURE AND BACTERIA REPORT 2) COMPLETE INSTALL OF SODA DISPENCING EQUIP. 3) INSTALL FLOOR SINKS GRATES 4) MAKE WATER TIGHT ALL FIXTURES 5) DISCHARGE DRAIN FROM DISHWASHER INTERCEPTOR SEPERATOR SO SANTEE IS AT 45 DEGREE MINIMUM 6) INSTALL VACUUM RELIEF VALVE ON WATER HEATER PER PLAN |