Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/29/2009 | ENGINEERING - FINAL | Approved | ||
| 09/04/2009 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O APPROVED AT THIS TIME. FINAL NOT TO BE GIVEN UNTIL ALL PREVIOUS COMMENTS FROM 9/3/09 HAVE BEEN ADDRESSED AND APPROVED. | |
| 09/03/2009 | ENGINEERING - FINAL | Denied | 1) COMPLETE ALL EXTERIOR WORK TO INCLUDE COMPLETION OF THE MODIFIED DRIVE-THROUGH NOT SHOWN ON ANY SITE PLAN. 2) REMOVE ALL CONSTRUCTION DERBRIS, MATERIAL, AND EQUIPMENT PRIOR TO INSPECTION. 3) INSTALL HC PARKING SIGN AT HC PARKING SPOT. 4) PROVIDE A SITE PLAN SHOWING CHANGES MADE TO THE EXTERIOR OF THE BLDG. |