Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/30/2009 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 07/28/2009 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) MAY NOT INERMINGLE MATERIAL TYPES I.E. SCHEDULE 40 ABS TO SCHEDULE 40 PVC OR SDR 35 2) CLEANOUTS AR TO OPEN IN THE DIRECTION OF FLOW A TWO WAY CLEANOUT FITTING MAY BE USED WHERE THE BLDG DRAIN MEETS THE BLDG SEWER 3) ALL PIPING TO BE TESTED 4) SUPPORT ALL STUB OUTS 5) INSULATE PIPING PER PLAN 6) FILL INTERCEPTOR 7) HORIZONTAL X HORIZONTAL CHANGE OF DIRECTION TO BE ON SWEEP |