Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/12/2010 | ENGINEERING - FINAL | Approved | ||
| 03/24/2010 | ENGINEERING - FINAL | Denied | INDICATE CHANGES MADE TO SITE ON APPROVED SITE PLAN AND/OR PROVIDE AN APPROVED SITE PLAN THAT SHOWS ALL THE CHANGES MADE TO THE ORIGINAL PLAN. CHANGES MADE BUT NOT SHOWN ARE: 1) CURB OPENING ADDED THROUGHOUT THE PARKING AREA FOR SURFACE DRAINAGE. 2) SEVERAL WATER HARVESTING AREAS AND A RET/DET BASIN NOT SHOWN ON PLANS. 3) ORIGINAL PLAN SHOWS ROOF DRAINS DRAINING INTO LANDSCAPE AREAS. ROOF DRAINS WERE CONSTRUCTED TO DRAIN INTO CISTERNS. 4) PROVIDE DETAILS AND APPROVAL FOR THE ADDITION OF CISTERNS AND ASSOCIATED PIPING. 5) ROW ACCESS SIDEWALK ALONG SOUTH SIDE NOT CONSTRUCTED. 6) ALL 30" MASONRY SCREEN WALLS NOT CONSTRUCTED. 7) REMOVE NOTE #14 ON APPROVED PLAN OR INDICATE NEW SIDEWALKS ONLY AND NOT ACCESS RAMPS. 8) INSTALL "DO NOT ENTER" SIGN AS SHOWN ON PLANS. 9) COMPLETE ALL LANDSCAPING TO INCLUDE INSTALLATION OF DG AT REAR OF BLDG, SHOW ON APPROVED PLAN. 10) SHOW ROOF DRAIN AND WATER HARVESTING BASIN OVERFLOW PIPING INSTALLED ON APPROVED PLANS. ALL DESPREPENCIES FOUND MAY OR MAY NOT BE A COMPLETE LISTING, MORE DESCEPENCIES CAN BE ADDED IF FOUND ON ADDITIONAL INSPECTIONS. |