Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T09CM01269

Parcel: 107031840

Inspection Status: Approved

Inspection History: MECHANICAL - ABOVE CEILING

Date Description Inspector Results Comments
08/27/2009 MECHANICAL - ABOVE CEILING Approved IVRS - Inspection :*
1) 1ST AND 2ND FLOOR PRODUCTION AREA OK FOR TILES, MECH ONLY
08/21/2009 MECHANICAL - ABOVE CEILING Partial Approval IVRS - Inspection :*
1) OK FOR TILES IN LOBBY, BREAK ROOM AND TESTING AREA
08/19/2009 MECHANICAL - ABOVE CEILING Not ready for Inspection IVRS - Inspection :*
1) INSTALL FLEX PER PLANS ON ADDENDUM FROM ENGINEER DATED 8/18/09 MEL FILE #09-010
08/17/2009 MECHANICAL - ABOVE CEILING Partial Approval IVRS - Inspection :*
1) OK TO BUILD CHASE AROUND EXISTING DUCT BOTH FLOORS PRODUCTION AREA AND SOFFIT ALONG EAST WALL 1ST FLOOR PRODUCTION AREA
08/12/2009 MECHANICAL - ABOVE CEILING Partial Approval IVRS - Inspection :*
1) FLEX DUCT NOT TO EXCEED 5' PER 16.A MECH SPECS M5.0
2) ALL SPIRAL JOINTS TO BE MADE WITH SPIRAL MATE OR EQUAL PER 4.C. MECH SPECS AT M5.0
3) PROVIDE CURB INSULATION PER DETAIL 1 M3.0
4) PROVIDE MINIMUM 3" COLLARS AT REGISTERS WHERE FLEX DUCT IS DIRECTLY ATTACHED
5) H.E. TAPS ARE TO HAVE FULL SIZE TAP INTO DUCT ROUND HOLES THE PIPE DIAMETER NOT ACCEPTABLE
6) INSTALL VOLUMN DAMPERS PER PLANS
7) SEAL H.E. TAPS PER SPECS