Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T09CM01232
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/06/2009 | ELECTRIC - FINAL | Approved | ||
08/05/2009 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) STRAP SEAL TIGHT WITHIN 12" OF CONNECTIONS NEED TO BE STRAPPED EVERY 54" IN BETWEEN 2) CANNOT USE FLEXIBLE CORD AS PERMANENT WIRING METHOD 3) NEED MINIMUM 12 GAUGE WIRE ON 20 AMP CIRCUIT 4) SEAL RACEWAYS INTO COOLERS 5) GROUND METAL BOXES 6) BOXES TO BE PROPERLY SECURED 7) HAVE QUALIFIED ELECTRICAL CONTRACTOR MAKE CORRECTIONS AND CHECK ELECTRICAL WIRING TO COOLERS |
|
08/03/2009 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1) ALL PREVIOUS ITEMS CORRECTED 2) NEED TO FINISH WIRING FOR WALK IN COOLERS |
|
07/31/2009 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) DISCONNECTS TO BE GROUNDED. INSTALL BONDING SCREW 2) NEED MINIMUM 6" OF FREE CONDUCTOR LENGTH 3) RECEPTACLES WITH NO POWER 4) NEED MINIMUM 2 SCREWS TO MOUNT RECEPTS IN INDUSTRIAL COVERS 5) HAVE OPEN JUNCTION BOX ABOVE CEILING 6) CLOSE OPEN GUTTER 7) STRAP SEAL TIGHT AND METAL FLEX PER CODE 8) CANNOT ACCESS WALK INS, TILE BEING INSTALLED 9) FINISH WIRING WALK INS 10) INSTALL SERVICE RECEPTACLE FOR A/C UNIT ON ROOF |