Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - INTERMEDIATE
Permit Number - T09CM01223
Inspection Description - MECHANICAL - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/29/2009 | MECHANICAL - INTERMEDIATE | Approved | ||
09/28/2009 | MECHANICAL - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) ITEM 9 DATED 9/24/09 STILL NOT COMPLETE 2) PROVIDE MINIMUM R-8 IN VENTED ATTIC 3) PRIMARY CONDENSATE TO TERMINATE AT AN APPROVED LOCATION 4) SECONDARY CONDENSATE TO TERMINATE AT AN APPROVED LOCATION |
|
09/24/2009 | MECHANICAL - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) CANS NEED TO BE FRAMED IN ON 3 SIDES 2) ALL DUCT JOINTS TO BE SEALED AND EXPOSED FOR INSPECTION 3) ALL FLEX CONNECTIONS TO BE PER DETAIL 1-M2 4) ALL STRAPS TO BE GALV METAL PER DETAIL 1-M.2 5) ALL TAPS TO BE H.E. PER DETAIL 1-M.2 6) REMOVE TAPE FROM B-VENT PIPING 7) PROVIDE MINIMUM 1" CLEARANCE TO COMBUSTIBLE MATERIAL WITH B-VENT PIPING 8) ALL PVC PIPING TO HAVE PRIMERED JOINTS PRIMER TO BE PURPLE IN COLOR PER UPC 9) PROVIDE UNIT ACCESS IN ATTIC PER IMC |
|
08/17/2009 | MECHANICAL - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) PROVIDE MINIMUM R-8 INSULATION IN VENTED ATTIC 2) PROVIDE FULL RADIUS BENDS AT 1ST FLOOR RETURN DUCT |