Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/21/2009 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 09/28/2009 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1) FROM METER LOCATION AT WATER HEATER 1 1/4 STUBBED INTO BDLG UP TO CEILING SPACE FOR AC-1 AND AC-2 TEST PARTIAL APPROVAL PER RED LINE ON SITE. RETEST FOR CONTINUATION TO 2 UNITS |
|
| 07/09/2009 | PLUMBING - GAS PRESSURE TEST | Partial Approval | 1) 1 1/4 CSST FROM EXISTING STRUCTURE N.W. CORNER UP TO 2ND LEVEL CEILING SPACE ROOM 203 TEST PARTIAL APPROVAL |