Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/08/2009 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 12/03/2009 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. NOT UNDER TEST 2. A SAW T IS NOT ALLOWED TO BE INSTALLED HORIZONTALLY 3. CLEANOUTS SHALL BE INSTALLED VERTICALLY ABV FLOW 707.6 4. 1002.3 TRAP ARM CHANGES DIRECTION 5. OK TO INSULATE 6. VERTICAL VENT RISER REQUIRES CLAMP. |
|
| 11/30/2009 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) DRAINAGE FITTINGS REQUIRED ON TRAP ARM 2) TRAP ARM MAY NOT EXCEED 90 DEGREE WITHOUT ADDITIONAL CLEANOUT 3) TRAP ARM REQUIRES SUPPORT 4) OK TO INSULATE HW PIPING |