Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/15/2009 | FRAMING | Approved | IVRS - Inspection :* NOTE: 1) NEED PLASTER RING FOR UFER CONNECTION NEXT TO RANGE RECEPT |
|
| 07/14/2009 | FRAMING | Partial Approval | IVRS - Inspection :* 1) PROTECT H20 LINE AND ELECTRIC ROMEX AT KIT SINK, NAIL LATH TO NEW CRIPPLE 2) NEED PLASTER RING AT UFER CONNECTION (FROM LAST INSPECTION) |
|
| 07/13/2009 | FRAMING | Not ready for Inspection | IVRS - Inspection :* 1) CRIPPLE STUD BELOW KIT SINK/STUCCO NAILING 2) UFER CONNECTION PLASTER KING KIT. WALL 3) MISSED INSULATION 2ND FLOOR TUB 4) BACKING AT SHOWER 2ND FLOOR 5) NO POTABLE H20 PRESSURE 6) DWV, NO HANDLE ON HOSE BIB |