Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/14/2009 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* 1) FLEX SIZE AT G5 2) CAP VALVES AT APPLIANCES NOT YET INSTALLED 3) AFTER COMPLETING THESE ITEMS YOU MAY TURN ON GAS TO TEST ANSUL SYSTEM. TAG PROVIDED |
|
| 08/13/2009 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* | |
| 07/01/2009 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1) FROM STUB AT METER THRU JUMPER AT ANSUL VALVE TO STUBS FOR APPLIANCES OK 2) WILL NEED TO RETEST AFTER ALL VALVES INCLDUDING ANSUL VALVE INSTALLED |
|
| 06/30/2009 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE RED LINES FOR DELEATION ON GAS PIPING TO APPLIANCES 2) INSTALL PER SIZING ON APPROVED GAS PLAN 3) INSTALL BLDG SHUT OFF PER PLAN 4) TESTING WILL BE REQUIRED THRU ANSUL VALVE TO ALL APPLIANCE SHUT OFF VALVES |