Permit: T09CM01049

Parcel: 141113820

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Date Description Inspector Results Comments
02/24/2011 ENGINEERING - FINAL Approved DISCUSSED PARKING LOT CHANGES WITH LAITH ALSHAMI TO ENSURE THAT THE CHANGES WOULD NOT AFFECT THE PAAL ACCESS INTO THE BUILDING.
02/14/2011 ENGINEERING - FINAL Partial Approval MET CHRIS ON SITE AND WALKED THROUGH TO SEE IF ALL OF THE ITEMS HAVE BEEN ADRESSED FOR THIS SITE AND PLACED ON THE AS-BUILT DRAWINGS FOR THIS SITE. CHRIS WILL ADVISE WHEN ALL OF THE INSPECTIONS HAVE BEEN COMPLETED AND THE PLANS HAVE BEEN APPROVED.