Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
Permit Number - T09CM01016
Inspection Description - BUILDING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/15/2009 | BUILDING - FINAL | Approved | ||
06/11/2009 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. SEE #5 FROM 6-8 LAYING LOOSE COLD PATCH IS NOT OK 2. THRESHOLD AT REAR EXIT INCOMPLETE 3. FLOORS HAVE BEEN COVERED WITH PLYWOOD WITH NO ENGINEERING REVIEW OR INSPECTION 4. STAGE BUILT WITHOUT PERMITS OR INSPECTION 5. GRAB BARS IN ACCESSIBLE RESTROOM PULLED OFF WALL 6. 2ND RESTROOM FUNCTIONAL; BUT DOES NOT HAVE NEW FIXTURES AS INDICATED ON PLAN 7. ACCESSIBLE RESTROOM MUST HAVE TOILET 16"-18" FROM SIDEWALL 8. WEATHERPROOF ENTRANCE |
|
06/08/2009 | BUILDING - FINAL | Partial Approval | 1) NEED TO PROVIDE WHEEL STOP ON SIDE OF RAMP. 2) PROVIDE 12" EXTENSION ON RAMP HANDRAIL. 3) FINISH WIRING EMERGENCY LIGHTS 4) FINISH PANIC BAR HARDWARE AT REAR EXIT. 5) BOTTOM OF RAMPS MAY HAVE NO MORE THAN 1/4" VERTICAL RISE 6) NEED TO HAVE SPRINKLER SYSTEM INSPECTED AND APPROVED. 7) WORK DOES NOT APPEAR TO BE COMPLETE FOR SECOND RESTROOM. |