Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/15/2009 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 11/06/2009 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
| 09/29/2009 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) WATER TEST NEW DWV TO 10' AFF OK 2) PROVIDE PIPE WRAPS ON DWV PENETRATION THRU CONCRETE SLAB, MAKE CONNECTIONS TO EXISTING DRAINAGE AND PROVIDE RUN TEST WITH INSPECTION NOTE: SILFOSS REQUIRED ON UNDERSLAB COPPER WATER PIPING JOINTS |