Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/04/2009 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 10/08/2009 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) SOLID CORE PVC SPECIFIED, OK WITH STAMPED LETTER OF APPROVAL FROM YOUR ENGINEER 2) RECALL FOR APPROVAL WHEN YOU RECEIVE LETTER 3) CORRECT MINIMUM TRAP ARM DISTANCE AT MS 4) INSTALL PIPE WRAPS AND FS AND CALL FOR PRE-SLAB INSPECTION 5) DWV TEST TO 10' OK 6) GREASE TRAP OK 7) TYPE K COPPER BELOW SLAB OK 8) NEED TO INSPECT CANOPY ROOF DRAINS WITH TEST WHEN READY |