Inspection Status: Approved
Inspection History: ELECTRIC - UNDERGROUND
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/02/2010 | ELECTRIC - UNDERGROUND | Approved | ||
| 11/13/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1) SITE POLE LIGHTS 1-1" PVC IN AND OUT, LIGHT POLE BY FRONT ENTRANCE ALSO, FEEDS AIR COMPRESSOR, 1-1" FOR GROUNDING, WEST OF BLDG LIGHT POLE FEEDS CAMERA TO OK |
|
| 11/09/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1) 1-1" IN AND OUT TO SITE TO EAST 2 POLE LIGHTS OK 2) SIGN AND ESO FOR PUMPS FROM SOUTHEAST TO SOUTHWEST TO 3 POLE AND SIGN & ES03 PVC 3/4 PIPES IN TRENCH WITH 1-1" FOR POLE LIGHT OK 3) POWER FOR PUMPS UP WALL TO CONTROLER SOUTH WALL OK 4) OUTLETS ON SAME SOUTH WALL OK, EXTERIOR WALLS ONLY ON NORTH WALL 1 PIPE FOR CONDENSATION PUMP OK 5) WEST WALL 1 OUTLET OK |
|
| 10/08/2009 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1) NORTH SIDE OF BLDG SEAL OFF PIPES, TANK MONITORS, COMMUNICATIONS AND PIPES TO CANOPY SOUTH OF BLDG 40' SECONDARY FEEDER FROM SERVICE TO SUB PANELS 2) PVC OK 3-1 1/4 FOR AC TO ROOF IN TRENCH OK, BOND TO WATER OK AND 2-3/4 FOR SIDE LIGHTING OK |