Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/29/2011 | ENGINEERING - FINAL | Approved | ||
| 04/14/2011 | ENGINEERING - FINAL | Not ready for Inspection | ||
| 03/24/2011 | ENGINEERING - FINAL | Not ready for Inspection | 1) PROVIDE AN ELEVATION CERTIFICATE ASSURING THE FINISHED FLOOR ELEVATION OF THE NEW BLDG. 2) PROVIDE A CERTIFICATION STATEMENT FROM THE ENG OF RECORD STATING THAT ALL DRAINAGE WAYS AND SITE WORK WAS COMPLETED PER THE APPROVED PLAN. 3) PROVIDE A PLAN SHOWING WHAT WAS BUILT - WALL OPENINGS ALONG EAST WALL AND NEW FIRE HYDRANT 4) COMPLETE LANDSCAPING PER PLAN. 5) MAY NEED TO RE - VEGITATE SLOPE ALONG WASH TO PRE-CONSTRUCTION CONDITION. |
|
| 03/23/2011 | ENGINEERING - FINAL | Not ready for Inspection | ANTHONY 461-5854 |