Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/14/2009 | ENGINEERING - FINAL | Approved | Approved | |
| 07/10/2009 | ENGINEERING - FINAL | Denied | Complete the following prior to C of O. 1) Install tuncated domes per plan at HC crossing 2) Install 6" curb per plan. Call for re-inspection |