Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/30/2009 | ENGINEERING - FINAL | Approved | ALL CORRECTIONS HAVE BEEN MADE. APPROVED FOR C.O | |
| 07/29/2009 | ENGINEERING - FINAL | Approved | NOT READY FOR INSPECTION, CONTRACTOR NEEDS TO 1) CLEAN AREA AND REMOVE ALL CONSTRUCTION EQUIPEMENT, DEBRIS, AND DUMPSTER 2)DIRECT WATER FROM ROOF AWAY FROM SIDEWALK WITH SWALE 3) PLACE BUMPER BLOCK ON LAST PARKING STALL TO PREVENT OVERHANG INTO SIDEWALK. |