Permit: T09CM00570

Parcel: 14016003F

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Date Description Inspector Results Comments
07/30/2009 ENGINEERING - FINAL Approved ALL CORRECTIONS HAVE BEEN MADE. APPROVED FOR C.O
07/29/2009 ENGINEERING - FINAL Approved NOT READY FOR INSPECTION, CONTRACTOR NEEDS TO
1) CLEAN AREA AND REMOVE ALL CONSTRUCTION EQUIPEMENT, DEBRIS, AND DUMPSTER
2)DIRECT WATER FROM ROOF AWAY FROM SIDEWALK WITH SWALE
3) PLACE BUMPER BLOCK ON LAST PARKING STALL TO PREVENT OVERHANG INTO SIDEWALK.